DETERMINOVAENGINEERING INTELLIGENCE

REFERENCE / DATA CENTER COMMISSIONING

MYLLYKOSKI
MEGA SITE.

Commissioning engineering experience on mission-critical electrical and mechanical infrastructure within the atNorth FIN04 Myllykoski data center project in Kouvola, Finland.

CommissioningEPODChillersGenerators630 A feeds
FIN04atNorth Myllykoski mega campus
COMMISSIONINGElectrical + mechanical systems
2026Active project experience

COMMISSIONING ENGINEERING / FIELD SCOPE

Hands-on verification of critical data center infrastructure.

This reference is limited to commissioning engineering performed within the FIN04 project environment. The scope covers field-level electrical and mechanical verification, functional checks, measurements and hardware inspection before systems are released toward integrated operation.

RoleCommissioning EngineerEnvironmentMission-critical data center constructionLocationUmmeljoki–Myllykoski, Kouvola, Finland
01

EPOD systems

Commissioning activities on EPOD-related power infrastructure: installation readiness, field verification, interface checks and test progression.

02

630 A power feeds

Verification of 630 A electrical feeds, associated hardware and field measurements supporting safe energisation and functional testing.

03

Chiller systems

Commissioning and functional verification of chiller-related systems and their electrical/control interfaces as part of cooling-system readiness.

04

Generator systems

Generator commissioning support, hardware checks and verification of interfaces within the resilient standby-power architecture.

05

Electrical measurements

Field measurements on buses and connected hardware, recorded against commissioning requirements and installation status.

06

Hardware verification

Inspection and verification of installed equipment, connections and system interfaces before functional and integrated test stages.

SYSTEM VIEW

Commissioning across the critical path.

GRIDIncoming power
MV / LVDistribution
EPODPower modules
GENERATORSResilience
COOLINGChillers
IT LOADOperational target

PUBLIC PROJECT CONTEXT

A Nordic-scale data center campus.

atNorth currently describes FIN04 as a 45-hectare Myllykoski mega campus in Kouvola with 430 MW power capacity and a path to several hundred additional megawatts. The campus is intended for both colocation and build-to-suit deployments. These figures describe the overall atNorth campus — not Determinova’s commissioning scope.

430 MWpublished campus power capacity45-hectare FIN04 campus. Public atNorth project context; not a Determinova delivery claim.

Scope statement. This case study describes commissioning experience within the Myllykoski FIN04 project environment. It does not state or imply that Determinova Oy designed, supplied, owned, operated or acted as the main contractor for the FIN04 campus. Project-owner and campus-scale information is based on publicly available atNorth material.

DATA CENTER COMMISSIONING

From installation complete
to verified operation.